Standard Construction Specifications Part 2 Abu Dhabi [work] -

In Abu Dhabi, Standard Construction Specifications (SCS) Part 2 typically refers to the detailed technical requirements and specific construction methods that support the general road and infrastructure frameworks. These standards are governed by the Abu Dhabi Quality and Conformity Council (QCC) and the Department of Municipalities and Transport (DMT). Overview of Part 2 Specifications

Trap #2: Backfilling Utility Trenches

The Rule: Section 205 – Select fill material for trench backfill must be crushed gravel passing 19mm sieve, with zero organic matter. The Violation: Using excavated native desert sand (which contains salts and fines). Fix: Import approved granular fill. Test every 300m³ for chloride content (< 0.2%).

Need More Information?

For the latest addenda or clarification on specific clauses Standard Construction Specifications Part 2 Abu Dhabi, contact: Department of Municipalities and Transport (DMT) – Technical Standards Section
Email: standards@dmt.gov.ae (official)
Online portal: services.dmt.gov.ae/standards standard construction specifications part 2 abu dhabi

Civil Works (C-Series): Detailed standards for kerbs, bollards, crosswalks, pavement sections, and median barriers.

The Abu Dhabi Standard Construction Specifications (SCS) Part 2 (specifically TR-542-2) primarily covers Road Structures and Utilities. While Part 1 focuses on general road works, Part 2 provides the detailed technical requirements for the supporting infrastructure and specialized structures required for transportation projects in the Emirate. Key Features of Part 2 (Road Structures & Utilities) The Violation: Using excavated native desert sand (which

5. How to Reference Correctly

If you need to cite it in a technical submittal or shop drawing:

Alternatively, major Abu Dhabi project clients (like ADNOC, ADDC, AADC, Abu Dhabi Municipality) also reference ADSCC Part 2 in their contract documents. Need More Information

Contractors without BIM-level 2 capability (as per PAS 1192, adapted) cannot bid on major municipal projects.